fbpx

Closed

Design, Supply And Install Solar Power Systems

Publication date: 9th July 2018

Submission date: 9th December 2018

Category: Construction

Region: Ghana

Entity: Social Security and National Insurance Trust (SSNIT)

Description: The Social Security and National Insurance Trust (SSNIT) intends to undertake a pilot project for the installation of a Grid-connect (Grid-tie) solar electrical power system at its Akwapim Mampong Branch Office as part of measures to achieve high energy efficiency.

            Visit website >>

 

Search